HIU servicing / London

HEAT INTERFACE UNIT SERVICING, MEASURED.

Technical servicing for apartment HIUs and development-wide programmes across London, focused on condition, operation and performance—not a superficial visual check.

Book HIU servicing
Modern high-rise residential infrastructure
HIU TECH / TECHNICAL SCOPE01—03
01

A technical inspection sequence

The service follows the energy path from primary network connections through heat exchange, domestic hot water and space-heating circuits.

  • Record manufacturer, model and serial data
  • Inspect isolation, strainers, joints and visible condition
  • Measure primary and secondary temperatures
  • Verify domestic hot-water response under flow
  • Test heating demand, pump and control outputs
  • Review meter and controller indications
  • Record defects, observations and recommended actions
02

Performance, not just operation

A unit can deliver heat while returning excessive temperature or responding poorly to demand. Recorded measurements create evidence for individual repair and network-level decisions.

03

Safe engineering attendance

Conclusive diagnosis requires an engineer on site to measure temperatures, pressures, flow, electrical supply and control response under operating conditions. Do not remove the HIU cover or attempt adjustments before attendance.

PRIMARY 70.2°CRETURN 41.8°CΔT 28.4KFLOW 11.6 L/MIN

Measure. Diagnose. Resolve.

Technical clarity before intervention.

Start a support request