Systems hub / modern apartment

INTERCONNECTED BY DESIGN.

HIU, CIU, FCU, MVHR, hot water, water treatment, LED lighting, drivers, pumps, valves, actuators, metering and controls operate within one technical residential environment.

Request a system diagnosis
Modern high-rise residential infrastructure
HIU TECH / TECHNICAL SCOPE01—04
01

Mechanical and water systems

Heating, cooling, ventilation and water systems interact with the building supply, apartment distribution and occupied space.

02

Lighting at component level

Architectural LED systems connect the electrical supply, lighting controls, dimming interface, driver, LED module and delivered light. Each layer must be identified and verified before replacement.

03

Electrical and electronic control

Sensors, controllers, actuators, thermostats, pump signals, LED drivers and lighting interfaces translate demand into controlled physical response.

04

System-level verification

Conclusive diagnosis requires an engineer on site to measure temperatures, pressures, flow, electrical supply and control response under operating conditions.

PRIMARY 70.2°CRETURN 41.8°CΔT 28.4KFLOW 11.6 L/MIN

Measure. Diagnose. Resolve.

Technical clarity before intervention.

Start a support request