Why attendance is required
Conclusive diagnosis requires an engineer on site to measure temperatures, pressures, flow, electrical supply and control response under operating conditions.
Technical fault guide / engineer attendance
Cooling availability, CIU control, circulation, fan-coil demand and condensation protection require on-site checks.
Book an engineer visit
Conclusive diagnosis requires an engineer on site to measure temperatures, pressures, flow, electrical supply and control response under operating conditions.
The visit identifies whether the cause sits in the dwelling circuit, the interface unit, its controls or the wider building network.
HIUs and CIUs contain hot, pressurised and electrically live components. Do not remove covers or attempt adjustments; request technical support.
Measure. Diagnose. Resolve.